Model U Gen 2 7.4 kW Installation, Circuit 2 with Max Storage Cabinet, Lam Luk Ka, Pathum Thani
Installation of an EV Easy Model U Gen 2 7.4 kW charger (1-phase 32 A) in Lam Luk Ka, Pathum Thani Province. The technicians ran a separate Circuit 2 dedicated to the charger, using a main panel with a Schneider Electric main breaker, and installed a Max storage cabinet to keep the cable and equipment tidy and protected from sun and rain. The electrical system was checked and charging was tested before handover.
Installation details
| Products used in this project | |
|---|---|
| Type of site | Residential home |
| Installation date | |
| How we work | Site assessed from photos or video before quoting · installed with residual-current protection · system tested with electrical test equipment before handover · on-site usage training |
Every EV Easy installation follows the same process: we check the meter size, main cable and the existing electrical panel to decide whether to connect from the existing panel or use a separate meter for the charger, run cables sized for the charger's current, install a dedicated residual-current breaker for the charging circuit, and test the whole system before handover — see the details on our installation service page
Photos from this installation
Want an installation like this at your home?
Send photos or a video of the installation spot on LINE @eveasy and our team will quote before you decide.







