Model U Gen 2 7.4 kW Installation, Circuit 1 with DLB, Sai Mai District, Bangkok

Installation of an EV Easy Model U Gen 2 7.4 kW charger (1-phase) in Sai Mai District, Bangkok, on a Circuit 1 setup with a 40 A MCB breaker and a Type B 40 A residual current device. A grounding system was installed with a 5/8 inch ground rod, 2.4 metres long, and a DLB (Dynamic Load Balancing) system was added, which monitors the home's power usage and adjusts the charging current automatically. The customer can view the home load and charger load in the app.

Installation details

Installation details — Model U Gen 2 7.4 kW Installation, Circuit 1 with DLB, Sai Mai District, Bangkok
Products used in this project
Type of siteResidential home
Installation date
How we workSite assessed from photos or video before quoting · installed with residual-current protection · system tested with electrical test equipment before handover · on-site usage training

Every EV Easy installation follows the same process: we check the meter size, main cable and the existing electrical panel to decide whether to connect from the existing panel or use a separate meter for the charger, run cables sized for the charger's current, install a dedicated residual-current breaker for the charging circuit, and test the whole system before handover — see the details on our installation service page

Photos from this installation

Want an installation like this at your home?

Send photos or a video of the installation spot on LINE @eveasy and our team will quote before you decide.

Read more

Ask our team on 093-359-2207 or LINE @eveasy

Ask us on LINE(opens the LINE app in a new tab)